Terrible Tile Timing
I was laying the tile out Monday and making all the cuts t go around the walls and pipes, when I realized I'm short a few sheets. Now I have to place another order for more tile which will take another couple weeks to get it. Sucks. I was actually thinking about setting up the bathroom this weekend is all went well. Now, I've got to figure out something else to do. Paint maybe?
I can't figure out how it happened either. The math doesn't make sense. I needed 48 sq ft (9' x 5' 4" room) and I got 50.75 sq ft. Yet I'm short 8 sq ft. So I actually needed 58 sq ft. How is that possible? Why should I need almost 20% more? Even after all the cuts I've made, there really isn't a lot of leftover scraps. Where did it go?
Oh well. At least seeing it all laid out on the floor like this, I can tell it's gonna be totally sweet when it's done.